This DIP switch determines how an anticipated peak (pre-peak) signal will affect the mini receiver’s relay(s). For power companies desiring to control loads separately using multiple signals, this DIP switch can be used to do peak control of devices on a separate rate/control strategy.
Off = Relay(s) will not respond to an anticipated peak (pre-peak) signal.
On = Relay(s) will be activated by an anticipated peak (pre-peak) signal.
NOTE: The peak signal is priority signal. When a peak signal is being received, no other signal will be recognized.