NOTE 4: Overrides - CCRP

Optional, Power Company Permitting / Multiple Control Strategies

With the addition of the 3-zone override module to the CCRP, peak override of 6 of the 9 circuits is possible. If enabled, relays 1, 2, 3, 7, 8, or 9 can be used in 60-minute intervals during a peak control period, if desired. Devices controlled by relays 4, 5, and 6 can never be overridden. Installation instructions for this feature are provided with the override module. (Order item #1302060.)

For power companies desiring to control loads separately using multiple signals, the override ports in the terminal block can also be used to recognize these signals and trigger the peak control.

OV1 = allows relay 1 circuit to be overridden or controlled on a separate rate/control strategy

OV2 = allows relay 2 circuit to be overridden or controlled on a separate rate/control strategy

OV3 = allows relay 3 circuit to be overridden or controlled on a separate rate/control strategy

OV4 = allows relay circuits 7, 8, and 9 to be overridden (cannot override these circuits separately) or controlled on a separate rate/control strategy

* The 4-pole CCRP is configured to utilize relays 1, 2, 3, and 7.